Burullus, Egypt
Installing (Part 1): February - July 2017
Removal (Part 2): March 2018
Client: Dredging International
Project:
- Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.
Techniques used:
- Vibratory driven piling of a total of 460 stretching metres of sheet piles (2*170+ 2*50+ 2*10)
- 50 metre trench onshore, 120 metre trench offshore
- Length sheet piles varÿing from 10 to 26 metres
Features:
- Anchoring of the head curtain by way of an anchor or an anchor panel
- All operations carried from a causeway constructed at the same time as the sheet pile
Three members of staff, along with all the necessary equipment for the construction of the sheet pile travelled to Egypt for this project.