project details

Burullus Cofferdam

Burullus, Egypt

Installing (Part 1): February - July 2017

Removal (Part 2): March 2018

Client: Dredging International

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.

Techniques used:

  • Vibratory driven piling of a total of 460 stretching metres of sheet piles (2*170+ 2*50+ 2*10)
  • 50 metre trench onshore, 120 metre trench offshore
  • Length sheet piles varÿing from 10 to 26 metres

Features:

  • Anchoring of the head curtain by way of an anchor or an anchor panel
  • All operations carried from a causeway constructed at the same time as the sheet pile

Three members of staff, along with all the necessary equipment for the construction of the sheet pile travelled to Egypt for this project.